Introduction:
Applicable to the new railway line, both lines, repair and operation of the line maintenance of the track bed to throw ballast, with ballast, plastic and cleaning. Can be scattered on the sleeper or fasteners on the ballast clean, collected through the conveyor belt to the storage ball hopper, in the need to fill the ball on both sides of the ball to fill ballast. Can be two-way ballast shaping, one-way cleaning operations.
Vehicles with full hydraulic drive, with high and low stalls, brake protection, commutation protection, operating mechanism lock, emergency reset and many other security devices to ensure the safety of operations and traffic.